5270 South Yampa Court
Centennial, Colorado 80015
THE
Site Availability
- The opportunity exists to increase the number of candidate installation sites within a search ring, or other geographic reference, by including locations otherwise unusable because the landlord or local authority has objections making conventional siting difficult or impossible.Minimized Schedules
- The option of an ESCS configuration within a search area permits schedule shortening through mitigation or elimination of site acquisition complications. Prefabricated, modular, and optimal installation methods permit efficiencies in logistics prior to arrival at the site. "Installation" construction techniques, using technicians specializing in the process, finish the site more quickly.Leasing and Zoning Appeal
- The landlord has the incentive to entertain innovation, which protects aesthetic values or presents a beneficial secondary use of the facility. In some cases, a portion of the property having no apparent value is converted to relevant specific use through the ESCS solution brought by the tenant-partner. Capital outlay by the landlord is foregone, but revenue is realized. "Unconventional" leasing can therefore increase the net worth of the site. Zoning authorities are given an alternative to the wearisome "ugly site" syndrome - gaining aesthetic appeal, multiple-use benefits, political palatability, and better communications service coverage for the community.Operability
- Upgrade, retrofit, and maintenance are readily accomplished for both the carrier and public segments through ease of access, standardized design and assembly techniques, and simplified components.Cost
- Cost saving/avoidance associated with use of the ESCS approach can be dramatic - suggesting the method may be a preferred, not a fallback, approach in many network segments. The length of time often required for protracted lease negotiations and zoning hearings, translating into longer burn time and delayed revenue, is reduced (leases for comparable products have been accomplished in time periods measured in hours rather than weeks or months). Factory production techniques convert "unique project" undertakings into commodity procurements, with all the normally related economies of scale. Material costs associated with multiple work phases in construction are consolidated and reduced. Standardized components and assembly methods simplify and reduce labor costs.